California Gateway Connector Projects
In 2025, the California Independent System Operator selected California Grid Holdings LLC as the approved developer for two high voltage transmission projects transecting eight northern California counties. Triple Point is supporting planning and permitting efforts with economic and fiscal analysis. The Projects would enable integration of clean energy resources and improve grid resiliency on the CAISO system.
